.

.

About Crosspoint

Led by a Craftsman Trained Inside a Multi-Generation Flooring Family.

Tony Bagniy learned the trade on jobsites with his father, a refinisher with three decades in Seattle's high-end remodel market. Crosspoint carries that forward with one standard: every floor is inspected to NWFA standards before it is called finished.

Start a Conversation
View Our Work
The Craft Behind the Name
Three Decades of Trade Knowledge. One Operating Standard.

Crosspoint exists because Tony's father spent thirty years building a reputation in Seattle's remodel market that never needed a website. Clients called because the last floor was still perfect ten years later.

That inheritance isn't a marketing story. It's a working method. Every project starts with a subfloor inspection, not a sales pitch. Every finish is applied in controlled conditions, and every floor is inspected to NWFA standards before we call it done.

We are not building the biggest flooring company in the Pacific Northwest. We are building the one contractors and designers call first when the project cannot go wrong.

Tony Bagniy, founder. Third-generation flooring craftsman.
0+
Years in the Trade
0+
Projects Completed
0K+
Sq Ft Installed
0%
Repeat & Referral
How We Work
Six Steps. No Surprises.
01
Consultation
We walk your space in person. Assess subfloor condition, measure, discuss your vision and timeline.
02
Scope & Material Sourcing
Written scope with species, grade, cut, and finish specified. We source from distributors we trust.
03
Subfloor Preparation
Level, repair, and moisture-test. This is where most flooring companies cut corners. We never do.
04
Installation
Board-by-board, grain-matched where it matters. Transitions built flush. Every cut measured twice.
05
Finishing
Stain applied in controlled conditions. Sealer coats built up methodically. No shortcuts on cure time.
06
Final Walkthrough
Full surface inspection with the client. We walk every room together before the job is called finished.
Common Questions
Questions Contractors and Designers Ask Us
How do you handle subfloor issues discovered mid-project?
We document, communicate, and quote the additional work before proceeding. No surprises on the invoice. If the subfloor needs more than expected, you know about it the same day we discover it.
What's your typical bid turnaround?
Site visit within 48 hours of first contact. Written scope and pricing within 5 business days of the walk-through. We don't ghost.
Do you work through GCs or directly with designers?
Either. We adapt to whatever communication structure the project needs.
What happens if something isn't right after install?
We inspect every floor to NWFA standards before calling it done. If something slips through, we come back and fix it at no charge. Our callback rate is under 2%.
Can you handle a 2,500 sq ft custom herringbone?
Yes. We've done herringbone, chevron, and custom patterns up to 4,600 sq ft. We grain-sort at the mill and dry-lay first.
How do you price compared to the market?
We don't lowball. Our bids reflect real scope, quality materials, and crew that shows up every day. If someone is quoting 40% less, they're cutting subfloor prep or finish coats.
Get Started
Ready to Start Your Project?

We respond to every inquiry within 48 hours. Tell us about your space, your timeline, and what matters most to you.

Schedule a Consultation