.
.
Our Process
Six Steps. No Guesswork.
01
Consult
Walk the space. Assess subfloor condition, measure, discuss vision and timeline.
02
Scope & Source
Written spec with species, grade, cut, and finish. Materials sourced from distributors we trust.
03
Subfloor Prep
Level with UZIN self-leveling compounds, repair, moisture-test. This is where most crews cut corners.
04
Install
Board-by-board, grain-matched where it matters. Transitions built flush.
05
Finish
DuraSeal stain applied in controlled conditions. Bona or Absco finish coats built up methodically. No shortcuts on cure time.
06
Final Walkthrough
Full surface inspection with the client. We walk every room together before the job is called finished.